Home  /  The Proof  /  Gregg’s Landing, Rethought Case Study

Gregg’s Landing, RethoughtVernon Hills, IL

Full-interior remodel with second-floor suite kitchen. A real project, a real address in Vernon Hills — shown with the real befores.
Gregg's Landing, Rethought — Kitchen

Kitchen · Vernon Hills, IL · professionally photographed

LocationVernon Hills, IL
ScopeFull-interior remodel with second-floor suite kitchen
InvestmentMid-$600,000s · fixed price
SpacesWhole Interior · Kitchen · Bar · Hidden Pantry · Primary Bath
The project

What we did,and why it worked.

A Gregg’s Landing home on Maidstone Drive whose owners wanted two things most remodels don’t attempt: real personality in every room, and a genuinely independent second-floor suite — with its own full kitchen — for family.

The main kitchen is white inset cabinetry with brass, chevron marble run to the ceiling, and a gray-washed oak island with a built-in banquette. Behind the chevron-paneled feature wall: a hidden walk-in pantry. The dining room went bold — navy grasscloth with a brass globe cluster and a matching navy butler’s bar. Upstairs, the primary bath is wrapped in blue-green zellige, and the second-floor kitchen quietly repeats the main floor’s standards. Out back, a new deck and rebuilt rear exterior finish the job.

The finished home

The finished rooms,one by one.

Gregg's Landing, Rethought — Dining Room
Dining Room
Gregg's Landing, Rethought — Kitchen
Kitchen
Gregg's Landing, Rethought — Kitchen
Kitchen
Gregg's Landing, Rethought — Kitchen
Kitchen
Gregg's Landing, Rethought — Office
Office
Gregg's Landing, Rethought — Stairway
Stairway
Gregg's Landing, Rethought — 2nd Floor Primary Bathroom
2nd Floor Primary Bathroom
Gregg's Landing, Rethought — Bar
Bar
Gregg's Landing, Rethought — Pantry
Pantry
Gregg's Landing, Rethought — Exterior Rear
Exterior Rear
The before

Where itstarted.

Gregg's Landing, Rethought — beforeBefore
Gregg's Landing, Rethought — beforeBefore
Gregg's Landing, Rethought — beforeBefore

Before: the rear yard and deck as we found them — the after includes the rebuilt exterior.

How this project ran — the same way every Icon project runs.

  • Design Agreement → fixed-price Construction Contract — bid and verified before you sign — the Compass, phase by phase
  • A written update every Friday — every job, every week
  • A 1-2-10 warranty in writing — one year on workmanship, two on systems, ten on structure — then Lifetime Partnership: 45-day check-in, 11-month walkthrough, annual touchpoints — the full service spec

See a home that feels like yours?
Let’s talk about it.

Start your journey — or just ask. Icon will take the meeting whether or not you ever sign a contract.

Start your journey → Are we the right fit? →