Home  /  The Proof  /  The Lakewood Manor Case Study

The Lakewood ManorVillage of Lakewood, IL

Whole-home remodel — main level, second floor, lower level. A real project, a real address in Village of Lakewood — shown with the real befores.
The Lakewood Manor — Living Room

Living Room · Village of Lakewood, IL · professionally photographed

LocationVillage of Lakewood, IL
ScopeWhole-home remodel — main level, second floor, lower level
InvestmentRange shared in person (client-requested privacy) — published market ranges in The Real Cost Guide
SpacesWhole Home · Great Room · Kitchen · Primary Suite · Lower Level
The project

What we did,and why it worked.

A large two-story in the Village of Lakewood that read builder-grade beige in every room. The family wanted warmth and a house that could host three generations without feeling formal.

The two-story great room now anchors the home — buff limestone fireplace, chunky stained-oak mantel, black candelabra chandelier. The kitchen pairs white shaker perimeter with a gray-stained island, chevron mosaic, and a black French-curve hood; the breakfast room got a beadboard tray ceiling and a wall of glass to the patio. Upstairs: a board-and-batten primary and a bath with a freestanding soaker and floor-mount filler. Downstairs: a wraparound slate-blue bar against reclaimed brick, and a rec room built for foosball tournaments.

The finished home

The finished rooms,one by one.

The Lakewood Manor — Exterior Front Entry
Exterior Front Entry
The Lakewood Manor — Foyer
Foyer
The Lakewood Manor — Living Room
Living Room
The Lakewood Manor — Living Room Feature
Living Room Feature
The Lakewood Manor — Kitchen
Kitchen
The Lakewood Manor — Kitchen
Kitchen
The Lakewood Manor — Breakfast Area
Breakfast Area
The Lakewood Manor — 2nd Floor Primary Bedroom
2nd Floor Primary Bedroom
The Lakewood Manor — 2nd Floor Bathroom
2nd Floor Bathroom
The Lakewood Manor — Lower Level Bar
Lower Level Bar
The Lakewood Manor — Lower Level Recreation Room
Lower Level Recreation Room
The before

Where itstarted.

The Lakewood Manor — beforeBefore
The Lakewood Manor — beforeBefore
The Lakewood Manor — beforeBefore

Before: the same rooms as we found them — dated finishes, phone photos, no staging.

How this project ran — the same way every Icon project runs.

  • Design Agreement → fixed-price Construction Contract — bid and verified before you sign — the Compass, phase by phase
  • A written update every Friday — every job, every week
  • A 1-2-10 warranty in writing — one year on workmanship, two on systems, ten on structure — then Lifetime Partnership: 45-day check-in, 11-month walkthrough, annual touchpoints — the full service spec

See a home that feels like yours?
Let’s talk about it.

Start your journey — or just ask. Icon will take the meeting whether or not you ever sign a contract.

Start your journey → Are we the right fit? →